The construction of a 46 km long pipeline project which includes 12,5 km long tunnel with an excavation diameter of 8,4 m, opened with a tunnel boring machine (TBM).
PIPELINE CONSTRUCTIONS
The aim of the project is to supply water to supply water to the Taif region in Saudi Arabia.