The construction of a 4,2 km long pipeline project which includes 3,850 m long tunnel with an excavation diameter of 6,1 m, opened with a tunnel boring machine (TBM).
PIPELINE CONSTRUCTIONS
The aim of the project is to supply water to the Atmania region in Algeria.