Construction of 2x267 km long water transmission pipeline
PIPELINE CONSTRUCTIONS
The pipeline project starts from point PS1 at Ras Al Khair and ends at point PS3 at Ad‐Dahna Desert. It includes the construction of twin steel pipelines that are 269 km in length with 72 inches in diameter.